Home > Project cases > Products Cases >

PRODUCT

Air-swept Coal Mill Liner for Shandong Linyi Hongyuan Therma

1. Project Overview
Project address: China•Shandong•Linyi
Construction unit: Linyi Hongyuan Thermal Power Co., Ltd.
Product name: Coal powder preparation•Air swept coal mill•Liner
Production scale: 50,000 tons/year vertical mill coal powder preparation station
Service Scope: Design, manufacture, transportation, installation, commissioning of the complete set of mill liners, removal of the complete set of liners of the original equipment and system operation.
 
2. Project Description
Shandong Kaiyuan Wood Industry Co., Ltd. was established in 1998. It has domestic advanced technology wood production lines, natural wood production lines, and floor fabric production lines, and has become a large-scale wood product deep processing enterprise in China. The company has successively passed ISO9001: 2008 international quality management system certification, ISO14001: 2004 international environmental management system certification, and international "FSC" forest certification. The company has successively won the honorary titles of "China Export Quality and Safety Demonstration Enterprise", "Shandong Forestry Leading Enterprise", "Key Leading Enterprise of Agricultural Industrialization City", "Shandong Famous Trademark", and passed the "High-tech Enterprise" in 2012. "Identified, in 2016, the company was named "China Export Quality and Safety Demonstration Enterprise". In order to achieve industrial intelligence, intelligent industrialization, cross-border integration, and high-end brand, the company established Linyi Hongyuan Thermal Power Co., Ltd. with the encouragement and support of governments at all levels.
 
3. Design Principles
(1) On the premise of meeting the requirements of production scale, the host adopts stand-alone and single-line equipment to achieve the purpose of smooth and compact production line, save land, and increase land use rate.
(2) The auxiliary equipment is based on the principles of stability, reliability, and energy saving to ensure normal production, high quality, high yield, and low energy consumption.
(3) Fully integrate the local natural conditions, optimize the design plan under the process and production conditions, and reduce the project cost as much as possible.
(4) Conscientiously implement relevant environmental protection, laws, regulations and standards, strictly control environmental pollution, reduce pollutant discharge, protect and improve the environment, and realize safe and civilized production.
 
4. Project Implementation
Beginning in 2015, the environmental protection department of Shandong Province has promoted pulverized coal as a clean energy to the province. Linyi City is a pilot. Heze Yuncheng Shengda Ruyi Printing and Dyeing Co., Ltd. approved the 20T pulverized coal boiler project, related to pulverized coal boilers and pulverized coal preparation stations. Carry out bidding work nationwide.
 
Henan Zhengzhou Mining Machinery Co., Ltd. contracted Linyi Hongyuan Thermal Power Co., Ltd.'s 6tph air-swept coal pulverizer complete coal preparation system, and delivered it on time and reached the standard and exceeded production.
 
The whole set of equipment has been in operation for more than 4 years. Due to the maintenance of the equipment, Hongyuan Thermal decided to purchase the complete liner of the mill from Zhengzhou Mine for maintenance. The quality of Zhengzhou's equipment has been fully recognized and trusted by customers.
 
 
5. Equipment List
No Name Model Qty
1 Liner Matching φ2.2×4.4m Air Swept Coal Mill 1 Set
 
 
6. Project Photos

Related Products

ONLINE MESSAGE

Hello 24 hours a day at your service
you are welcome to inquire

  • Name *

  • Whatsapp*

  • Capacity

  • E-mail *

  • Raw material

  • Company name

  • Message *