Thermal Power Pulverized Coal Preparation Station

Brief Introduction
Project Location: Shandong, China
Project Name:20T pulverized coal preparation station
Main Equipment: 6tph vertical Coal Mill
Since 2015, the environmental protection department of Shandong Province has promoted pulverized coal as clean energy to the whole province. Linyi City is a pilot project. Linyi Aobote Thermal Power Co., Ltd approved the 20T pulverized coal boiler project. The pulverized coal boilers and pulverized coal preparation stations begin to bid in China.
Henan Zhengzhou Mining Machinery Co., Ltd. has three successful project cases, namely, Linyi Shuangding Decoration Materials Co., Ltd., Linyi Xingyuan Thermal Power Co., Ltd., Linyi Hongyuan Co., Ltd. pulverized coal preparation station. Among them, the chairman of Linyi Xingyuan Thermal Technology Co., Ltd. recommended us to Aobote Thermal Power Company.
Our professional team went to the site of Aobote Thermal Power immediately.  Aimed at the specific arrangement of on-site boilers, our technical staff proposed the design. After a week of technical exchanges, the two sides confirmed 6tph vertical mill pulverized preparation station. On May 21, 2016, we signed a business contract. During the execution of the contract, we went to the site for several times to carry out program exchange and project schedule exchange. In September 2016, the ZKRM08.3 pulverizing coal preparation plant was successfully completed and passed the inspection at one time. To provide a good customer service, we not only save the cost of production for customers, but also improve customer productivity.
 
Advantages of Our Pulverized Coal Preparation Station
1. High grinding efficiency, low power consumption;
2. Less metal consumption per unit;
3. Material bed milling, low noise;
4. Negative pressure operation, less dust pollution;
5. Simple process, complete the material grinding, drying, selection of powder function at the same time;
6. Less land area, compact layout, system equipment, light weight, low investment cost in civil construction.
 
Our sales staff stationed at the scene for more than a month, for the on-site operator training and technical delivery, so that our customers can better use the equipment. Currently vertical mill pulverized coal preparation station of Heze Yuncheng Shengda Ruyi Printing and Dyeing Co., Ltd. has been operated for more than two years. The equipment has a smooth operation, which got a high praise from our customer. 

Related Products

ONLINE MESSAGE

Hello 24 hours a day at your service
you are welcome to inquire

  • Name *

  • Whatsapp*

  • Capacity

  • E-mail *

  • Raw material

  • Company name

  • Message *