Processing Ability: 5 - 58 (t/h)
Output Size: 0.015 - 0.25 (mm)
Application: Power Plant, Cement Plant
Applied material: coal, quartz, feldspar, calcite, limestone, dolomite, etc.
Parameter |
Unit |
HRM800 |
HRM1100 |
HRM1250 |
HRM1300 |
PRM17 |
PRM23 |
PRM25 |
Capacity |
T/H |
5-7 |
10-12 |
16-18 |
20-25 |
26-35 |
40-45 |
50-58 |
The size of grinding material |
mm |
0-40 |
0-40 |
0-40 |
0-40 |
0-40 |
0-50 |
0-50 |
The moisture of grinding material |
% |
<10 |
<10 |
<10 |
<10 |
<10 |
<10 |
<10 |
Fineness R0.08 |
% |
8-12 |
8-12 |
8-12 |
8-12 |
8-12 |
8-12 |
8-12 |
The moisture of product |
% |
<1 |
<1 |
<1 |
<1 |
<1 |
<1 |
<1 |
Power |
KW |
55 |
110 |
160 |
200 |
400 |
400 |
450 |
The wind temperature of input |
℃ |
≤350 |
≤350 |
≤350 |
≤350 |
≤350 |
≤350 |
≤350 |
The wind temperature of outlet |
℃ |
80-100 |
80-100 |
80-100 |
80-100 |
80-100 |
80-100 |
80-100 |
The air volume of outlet |
m3/H |
≈10000 |
≈20000 |
≈30000 |
≈40000 |
≈80000 |
≈80000 |
≈100000 |
The weight of equipment |
T |
16 |
22 |
32 |
40 |
96 |
135 |
167 |
Coal Powder Making Project of Ningxia Province
Thermal Power Pulverized Coal Preparation Station
Shandong Dongjia Group Pulverized Coal Preparation Station
Yuncheng Shengda Ruyi Pulverized Coal Preparation Station