Home > Project cases > GGBS Projects >

PRODUCT

30TPH Pulverized Coal Preparation Station in Shangdong

Brief Introduction
Project Name: 30TPH Pulverized Coal Preparation Station
Project Location: Shandong, China
Main Equipment: ZKRM15.2, 30 tph vertical mill
Contract Signed: December 14, 2016
Shandong Dongjia Group was established in 2002, which is one of Asia's largest titanium dioxide production base. At the request of the environmental protection department of Shandong Province, Dongjia Group rebuilt the boiler and build a new 120 ton pulverized coal boiler. The pulverized coal preparation station needs to be rebuilt. In Dongjia Group, there are two large vertical mill for grinding titanium dioxide, which need to find manufacturers to transform and then build 30TPH coal preparation center.
Due to our strong strength and many achievements on pulverized coal preparation project in Shandong, Dongjia Group found us. The professional team of Henan Zhengzhou Mining Machinery Co., Ltd rushed to the site of Dongjia Group for the first time. Aimed at the specific arrangement of on-site boilers, our technical staff proposed the design. After a week of technical exchanges, the two sides confirmed 30tph vertical mill pulverized preparation station. On December 14, 2016, we signed a business contract. During the execution of the contract, we went to the site for several times to carry out program exchange and project schedule exchange. In October 2017, the project of pulverizing coal preparation plant of ZKRM15.2 was successfully completed and passed the inspection at one time. To provide a good customer service, we not only save the cost of production for customers, but also improve customer productivity.
 
Advantages of Our Pulverized Coal Preparation Station
1.    High grinding efficiency, low power consumption;
2.    Less metal consumption per unit;
3.    Material bed milling, low noise;
4.    Negative pressure operation, less dust pollution;
5.    Simple process, complete the material grinding, drying, selection of powder function at the same time;
6.    Less land area, compact layout, system equipment, light weight, low investment cost in civil construction.
 
Our sales staff stationed at the scene for more than a month, for the on-site operator training and technical delivery, so that our customers can better use the equipment better. Vertical mill pulverized coal preparation station has a high technical requirement, difficult production process. Henan Zhengzhou Mining Machinery Co., Ltd has a wealth of experience in the design and production, which is trusted by customers!

ONLINE MESSAGE

Hello 24 hours a day at your service
you are welcome to inquire

  • Name *

  • Whatsapp*

  • Capacity

  • E-mail *

  • Raw material

  • Company name

  • Message *