Armenia 8-10 tph Cement Grinding Project
1. Project Overview
Project address: Yerevan, Armenia
Product name: Cement grinding (clinker, gypsum, slag)
Production scale: 8-10 per hour
Service Scope: Process design of the entire line, including raw material transportation, grinding, finished product storage and transportation system, dust collection system, electrical, etc., equipment supply, equipment transportation, etc.
The client's company address is Moscow and established a branch in Armenia. Currently they have two cement grinding lines in Armenia, and want to install a new grinding production line with 8-10 tons per hour output.
The entire production line includes: belt scale, belt conveyor, crusher, ball mill, fan, bag filter, screw conveyor, electrical equipment, etc.
2. Equipment List
No. |
Product Name |
Model |
Qtys |
1 |
Belt scale |
B500×1800 |
3 Sets |
2 |
Belt Conveyor |
B500×37.1m |
1 Set |
3 |
Hammer Crusher |
PC0806 |
1 Set |
4 |
Screw Conveyor |
LS250×4700 |
1 Set |
5 |
Cement Mill |
Ф1.83×9m |
1 Set |
6 |
Bag Filter |
PPC32-3 |
1 Set |
7 |
Fan |
9-19№8D |
1 Set |
8 |
Electrical System |
|
1 Set |
3. Shipment Photos